Road Closure at the Green in Loughton, 12-14 March:

Print Friendly, PDF & Email

TAKE NOTICE that works are for Wall Maintenance works, it is necessary to introduce a road closure in order for the works to be carried out. The following lengths of road will be closed on the following Dates and Times: 12th March 2021 – 14th March 2021 • The Green, Loughton (Between 9:30am and 4:30pm) Whilst the following length of road is closed there will be no alternative route for vehicles but pedestrian access will be maintained throughout the closure

Share

Leave a Reply

Your email address will not be published. Required fields are marked *